Client case

COMBINING EAM & HSE TECHNOLOGY WITHIN THE WASTE MANAGEMENT INDUSTRY

The Gloucestershire Energy from Waste Facility is designed to reduce the amount of residual waste, landfilled in Gloucestershire. Aside from the safety aspect of dealing with residual waste which cannot be recycled or composted, this energy from waste facility produces the equivalent electricity to power 25,000 homes, and contributes to Gloucestershire’s overall renewable energy production. Urbaser identified the need for a EAM System that aligned with the Power sectors approach to managing safety assessment of works with work order processes and enable the system to manage / connect with multiple sites. This is the first site to be considered.

DO YOU WANT TO LEARN MORE? OR PERHAPS READ THIS ARTICLE WHILE ON THE ROAD? Download now

Results Urbaser achieved:

  • 100% paperless multi-site process
  • 100% digitized regulatory compliance achieved
'The platform is extremely flexible and the project manager extremely competent at modifying the system to suit our needs.'
Andrew Evans
Urbaser
I'LL BE HAPPY TO KEEP YOU UPDATED AND INFORMED.
Will Batchellor Account Manager
will.batchellor@ultimo.com
+44 7538 960 705

Get a free demo